HomeEvidence & Status Ledger
INSTITUTIONAL DILIGENCE • SINGLE SOURCE OF TRUTH

Evidence & Engineering Status Ledger

Every technical, performance, IP, and market figure presented by BRC STAR is centrally governed in this ledger and explicitly classified by verification stage—ensuring institutional clarity between verified registry records, Stage 1 bench testing, computer simulation, and planned targets.

Patent Status: Indian Patent Application No. 202511050655 (patent-pending, filed with the Indian Patent Office; not yet published or granted).

Filter Ledger (18 / 18)
Claim / ParameterStated ValueEvidence StatusTesting Methodology / BasisSource / DateReference / NDA
IP & Corporate
Indian Patent Application

Patent-pending, filed with the Indian Patent Office; not yet published, not yet examined, and not granted.

App. No. 202511050655PlannedOfficial filing receipt with Indian Patent Office (IPO); exact date confirmation under NDA
Next Gate: Exact filing date publication / Form 18 Examination
Indian Patent Office (IPO) Filing Record (Under NDA)
May 2025 (Exact date under NDA)
NDA Data Room
IP & Corporate
DPIIT & State Incubation

Bootstrapped entity headquartered in Anupgarh, Rajasthan.

DPIIT Recognized • iStart RajasthanVerifiedGovernment of India DPIIT & DoIT&C Rajasthan Startup Registry
Next Gate: Prototype track grant & state EV testing support
CIN U34100RJ2019OPC066948 / Startup India Certificate
Active (Est. Nov 2019)
Inspect
Powertrain & ACM
ACM Rectifier & Boost Peak Yield

Target peak rectifier efficiency under controlled load; public test logs/photos pending attachment.

Up to 98.4% (Simulated / Rig Target)SimulatedAlternator Control Module (ACM) laboratory rig modeling (test logs available under NDA)
Next Gate: Link witnessed bench test log & integrated coupled dyno durability audit
Evidence available under NDA
NDA Data Room
Powertrain & ACM
Peak Decelerative Kinetic Harvest

Peak instantaneous deceleration/downhill recovery target—not continuous net cruise energy generation.

Up to +42 kW (Peak Deceleration Target)TargetTransient deceleration/downhill harvest envelope calculated from generator rating
Next Gate: Full drivetrain dynamometer torque-vs-harvest mapping
Evidence available under NDA
Inspect
Powertrain & ACM
Auxiliary Energy Recoup Model

Simulation only; bench and physical vehicle track validation pending.

Up to 32.8% (Simulation)SimulatedMATLAB/Simulink drive-cycle numerical simulation across urban stop-go & gradient profiles
Next Gate: Closed-course track A/B comparison against baseline single-pack EV mule
Evidence available under NDA
Inspect
Powertrain & ACM
Solid-State SiC Bus Switchover

Stage 2 solid-state commutator currently in simulation; physical full-load rig pending.

< 2.4 ms (Bus) / 1.8 µs (Gate Target)SimulatedSPICE & embedded hardware-in-loop SiC MOSFET ZVS switching simulation
Next Gate: 800V bench prototype fault-injection and transition oscilloscope trace
Evidence available under NDA
Inspect
Powertrain & ACM
System Bus Architecture

Modular 800V system architecture integrates two isolated 400V packs (Pack A & Pack B) paired with a 400V regulated ACM harvest output bus and 1200V-rated Silicon Carbide (SiC) commutation switches (switching matrix details available under NDA).

800V Dual-Bus (2 × 400V Packs)TargetSystem electrical topology design spec
Next Gate: Full high-voltage wiring harness assembly on test mule
Evidence available under NDA
Inspect
Battery & Thermal
Cell Thermal Differential Target

Designed to reduce thermal stress during charge/discharge isolation (target, not yet tested).

< 1.8 °C ΔT / 34.2 °C Peak TargetSimulatedCFD dielectric immersion flow modeling
Next Gate: Physical cell-module calorimeter & thermal chamber validation
Evidence available under NDA
Inspect
Battery & Thermal
Dual-Pack Cycle Life Target

Design target, not yet tested; depends heavily on cell chemistry, duty cycle & thermal management.

4,500+ Cycles (Target)TargetProjected duty-cycle sharing based on cell curves (depends on chemistry & thermal control)
Next Gate: 1,000-cycle multi-month cell cycler validation
Evidence available under NDA
Inspect
Battery & Thermal
EIS State-of-Health Model

Software/firmware estimator model; maintained as confidential know-how.

> 99.4% (Lab Dataset)SimulatedFirmware estimator evaluated against synthetic/bench cycler dataset
Next Gate: Blind dataset verification on aged automotive packs
Evidence available under NDA
Inspect
Vehicle Performance
StarCraft GT Target Endurance

Estimated target range on CAD/CFD concept. Real-world MIDC/WLTP range not yet measured.

Up to 850 km (Target)SimulatedVehicle longitudinal dynamics simulation combining 88 kWh capacity & drive-cycle model
Next Gate: Stage 3 rolling chassis prototype & track consumption test
Evidence available under NDA
Inspect
Vehicle Performance
StarCraft GT 0–100 km/h Target

Conceptual performance target; no road-tested mule exists yet.

3.2 s (Simulation Target)TargetCalculated from 380 kW dual-drive peak traction torque & estimated curb weight
Next Gate: Chassis fabrication & VBOX timing runs
Evidence available under NDA
Inspect
Vehicle Performance
Aerodynamic Drag & Downforce

CFD CAD simulation values; wind tunnel scale verification pending.

0.198 Cd / 104 kg DownforceSimulatedSteady-state CFD airflow modeling on StarCraft GT CAD body
Next Gate: Scale wind-tunnel correlation testing
Evidence available under NDA
Inspect
Economics & Market
Fleet Energy Cost Illustration

Illustrative estimate based on stated assumptions; not a guaranteed financial outcome.

Up to 38%–44% / ₹4.8L/yr (Illustrative)IllustrativeSpreadsheet sensitivity model assuming 150 km/day, ₹95/L diesel vs ₹8/kWh grid tariff (up to 38%, 44%, and 52% illustrative freight estimates)
Next Gate: Pilot logistics fleet telemetry logging
Internal Management Assumptions (Evidence available under NDA)
Inspect
Economics & Market
India EV Market Focus

Addressable market assumptions unaudited; subject to commercial adoption.

Growing Indian EV EcosystemTargetMacro sector positioning (detailed third-party TAM citations in NDA data room)
Next Gate: Append verified industry research citations in investor deck
Evidence available under NDA
Inspect
Economics & Market
Phase-2 Gross Margin Assumption

Phase-2 gross margin assumption (illustrative, unaudited; not a verified financial forecast).

28.5% (Illustrative, Unaudited)IllustrativeInternal pre-seed bill-of-materials target at scaled volume
Next Gate: Component vendor RFQs & CA-reviewed unit economics
Evidence available under NDA (Unaudited internal model)
Inspect
Economics & Market
Dealer Channel Interest

Informal, non-binding expressions of interest; no commercial franchise deposits collected.

18+ Non-Binding InquiriesPlannedInformal inbound expressions of interest logged via web & network outreach
Next Gate: Execute formal territory qualification post-homologation
Evidence available under NDA
Inspect
Regulatory
AIS / UN ECE Type Approval

Designed to target requirements; formal certification testing has not yet started or been obtained.

AIS-038, AIS-052, AIS-153, AIS-156, UN ECE R100PlannedEngineering requirements target list for future ARAI / ICAT homologation
Next Gate: Submit full-vehicle prototype to ARAI/ICAT post TRL-6
MoRTH / Automotive Research Association of India (ARAI) Guidelines
Inspect

Figures are simulated, bench-tested or target values at TRL 3/4. Real-world results will vary. Not a commitment of performance, delivery or price.

TRL PROGRESSION METHODOLOGY

How Claims Advance: Simulated → Bench → Track-Verified

Stage 1: Simulated (TRL 3)

Numerical MATLAB/Simulink models, SPICE switching behavior, and steady-state CAD/CFD airflow modeling establish preliminary engineering envelopes.

Stage 2: Bench-Tested (TRL 4)

Isolated hardware benches (currently Alternator Control Module active rectifier rig) followed by coupled 800V SiC commutation hardware-in-loop benches.

Stage 3: Mule Integration (TRL 5–6)

Fabricated physical test mule logging closed-course drive cycles with comparative baseline A/B telemetry under third-party observer witness.

Stage 4: Homologated (TRL 7–9)

Formal Indian type-approval and safety testing (AIS-038, AIS-156, AIS-052, UN ECE R100) conducted at authorized Indian testing agencies (ARAI/ICAT).

Voltage Architecture Clarification

Modular 800V system architecture integrates two isolated 400V packs (Pack A & Pack B) paired with a 400V regulated ACM harvest output bus and 1200V-rated Silicon Carbide (SiC) commutation switches (switching matrix details available under NDA).

Thermodynamics & Kinetic Recovery Principle

The Alternator Control Module (ACM) and Permanent Magnet Generator (PMG) recover a portion of the vehicle's own kinetic energy during deceleration, downhill grades, and coasting/glide phases (mechanical recovery imposes drivetrain load and does not create net energy). Claimed architecture goals focus on charge acceptance decoupling, reduced thermal stress in the propulsion pack, and decelerative recoup. Net range benefit depends on drive cycle and is being quantified on the test bench.

Conducting Institutional Technical or Financial Diligence?

Request access to test bench documentation, patent specification summaries, and financial models under NDA.

Request NDA Data Room