Evidence & Engineering Status Ledger
Every technical, performance, IP, and market figure presented by BRC STAR is centrally governed in this ledger and explicitly classified by verification stage—ensuring institutional clarity between verified registry records, Stage 1 bench testing, computer simulation, and planned targets.
Patent Status: Indian Patent Application No. 202511050655 (patent-pending, filed with the Indian Patent Office; not yet published or granted).
| Claim / Parameter | Stated Value | Evidence Status | Testing Methodology / Basis | Source / Date | Reference / NDA |
|---|---|---|---|---|---|
IP & Corporate Indian Patent Application Patent-pending, filed with the Indian Patent Office; not yet published, not yet examined, and not granted. | App. No. 202511050655 | Planned | Official filing receipt with Indian Patent Office (IPO); exact date confirmation under NDA Next Gate: Exact filing date publication / Form 18 Examination | Indian Patent Office (IPO) Filing Record (Under NDA) May 2025 (Exact date under NDA) | NDA Data Room |
IP & Corporate DPIIT & State Incubation Bootstrapped entity headquartered in Anupgarh, Rajasthan. | DPIIT Recognized • iStart Rajasthan | Verified | Government of India DPIIT & DoIT&C Rajasthan Startup Registry Next Gate: Prototype track grant & state EV testing support | CIN U34100RJ2019OPC066948 / Startup India Certificate Active (Est. Nov 2019) | Inspect |
Powertrain & ACM ACM Rectifier & Boost Peak Yield Target peak rectifier efficiency under controlled load; public test logs/photos pending attachment. | Up to 98.4% (Simulated / Rig Target) | Simulated | Alternator Control Module (ACM) laboratory rig modeling (test logs available under NDA) Next Gate: Link witnessed bench test log & integrated coupled dyno durability audit | Evidence available under NDA | NDA Data Room |
Powertrain & ACM Peak Decelerative Kinetic Harvest Peak instantaneous deceleration/downhill recovery target—not continuous net cruise energy generation. | Up to +42 kW (Peak Deceleration Target) | Target | Transient deceleration/downhill harvest envelope calculated from generator rating Next Gate: Full drivetrain dynamometer torque-vs-harvest mapping | Evidence available under NDA | Inspect |
Powertrain & ACM Auxiliary Energy Recoup Model Simulation only; bench and physical vehicle track validation pending. | Up to 32.8% (Simulation) | Simulated | MATLAB/Simulink drive-cycle numerical simulation across urban stop-go & gradient profiles Next Gate: Closed-course track A/B comparison against baseline single-pack EV mule | Evidence available under NDA | Inspect |
Powertrain & ACM Solid-State SiC Bus Switchover Stage 2 solid-state commutator currently in simulation; physical full-load rig pending. | < 2.4 ms (Bus) / 1.8 µs (Gate Target) | Simulated | SPICE & embedded hardware-in-loop SiC MOSFET ZVS switching simulation Next Gate: 800V bench prototype fault-injection and transition oscilloscope trace | Evidence available under NDA | Inspect |
Powertrain & ACM System Bus Architecture Modular 800V system architecture integrates two isolated 400V packs (Pack A & Pack B) paired with a 400V regulated ACM harvest output bus and 1200V-rated Silicon Carbide (SiC) commutation switches (switching matrix details available under NDA). | 800V Dual-Bus (2 × 400V Packs) | Target | System electrical topology design spec Next Gate: Full high-voltage wiring harness assembly on test mule | Evidence available under NDA | Inspect |
Battery & Thermal Cell Thermal Differential Target Designed to reduce thermal stress during charge/discharge isolation (target, not yet tested). | < 1.8 °C ΔT / 34.2 °C Peak Target | Simulated | CFD dielectric immersion flow modeling Next Gate: Physical cell-module calorimeter & thermal chamber validation | Evidence available under NDA | Inspect |
Battery & Thermal Dual-Pack Cycle Life Target Design target, not yet tested; depends heavily on cell chemistry, duty cycle & thermal management. | 4,500+ Cycles (Target) | Target | Projected duty-cycle sharing based on cell curves (depends on chemistry & thermal control) Next Gate: 1,000-cycle multi-month cell cycler validation | Evidence available under NDA | Inspect |
Battery & Thermal EIS State-of-Health Model Software/firmware estimator model; maintained as confidential know-how. | > 99.4% (Lab Dataset) | Simulated | Firmware estimator evaluated against synthetic/bench cycler dataset Next Gate: Blind dataset verification on aged automotive packs | Evidence available under NDA | Inspect |
Vehicle Performance StarCraft GT Target Endurance Estimated target range on CAD/CFD concept. Real-world MIDC/WLTP range not yet measured. | Up to 850 km (Target) | Simulated | Vehicle longitudinal dynamics simulation combining 88 kWh capacity & drive-cycle model Next Gate: Stage 3 rolling chassis prototype & track consumption test | Evidence available under NDA | Inspect |
Vehicle Performance StarCraft GT 0–100 km/h Target Conceptual performance target; no road-tested mule exists yet. | 3.2 s (Simulation Target) | Target | Calculated from 380 kW dual-drive peak traction torque & estimated curb weight Next Gate: Chassis fabrication & VBOX timing runs | Evidence available under NDA | Inspect |
Vehicle Performance Aerodynamic Drag & Downforce CFD CAD simulation values; wind tunnel scale verification pending. | 0.198 Cd / 104 kg Downforce | Simulated | Steady-state CFD airflow modeling on StarCraft GT CAD body Next Gate: Scale wind-tunnel correlation testing | Evidence available under NDA | Inspect |
Economics & Market Fleet Energy Cost Illustration Illustrative estimate based on stated assumptions; not a guaranteed financial outcome. | Up to 38%–44% / ₹4.8L/yr (Illustrative) | Illustrative | Spreadsheet sensitivity model assuming 150 km/day, ₹95/L diesel vs ₹8/kWh grid tariff (up to 38%, 44%, and 52% illustrative freight estimates) Next Gate: Pilot logistics fleet telemetry logging | Internal Management Assumptions (Evidence available under NDA) | Inspect |
Economics & Market India EV Market Focus Addressable market assumptions unaudited; subject to commercial adoption. | Growing Indian EV Ecosystem | Target | Macro sector positioning (detailed third-party TAM citations in NDA data room) Next Gate: Append verified industry research citations in investor deck | Evidence available under NDA | Inspect |
Economics & Market Phase-2 Gross Margin Assumption Phase-2 gross margin assumption (illustrative, unaudited; not a verified financial forecast). | 28.5% (Illustrative, Unaudited) | Illustrative | Internal pre-seed bill-of-materials target at scaled volume Next Gate: Component vendor RFQs & CA-reviewed unit economics | Evidence available under NDA (Unaudited internal model) | Inspect |
Economics & Market Dealer Channel Interest Informal, non-binding expressions of interest; no commercial franchise deposits collected. | 18+ Non-Binding Inquiries | Planned | Informal inbound expressions of interest logged via web & network outreach Next Gate: Execute formal territory qualification post-homologation | Evidence available under NDA | Inspect |
Regulatory AIS / UN ECE Type Approval Designed to target requirements; formal certification testing has not yet started or been obtained. | AIS-038, AIS-052, AIS-153, AIS-156, UN ECE R100 | Planned | Engineering requirements target list for future ARAI / ICAT homologation Next Gate: Submit full-vehicle prototype to ARAI/ICAT post TRL-6 | MoRTH / Automotive Research Association of India (ARAI) Guidelines | Inspect |
Figures are simulated, bench-tested or target values at TRL 3/4. Real-world results will vary. Not a commitment of performance, delivery or price.
How Claims Advance: Simulated → Bench → Track-Verified
Numerical MATLAB/Simulink models, SPICE switching behavior, and steady-state CAD/CFD airflow modeling establish preliminary engineering envelopes.
Isolated hardware benches (currently Alternator Control Module active rectifier rig) followed by coupled 800V SiC commutation hardware-in-loop benches.
Fabricated physical test mule logging closed-course drive cycles with comparative baseline A/B telemetry under third-party observer witness.
Formal Indian type-approval and safety testing (AIS-038, AIS-156, AIS-052, UN ECE R100) conducted at authorized Indian testing agencies (ARAI/ICAT).
Voltage Architecture Clarification
Modular 800V system architecture integrates two isolated 400V packs (Pack A & Pack B) paired with a 400V regulated ACM harvest output bus and 1200V-rated Silicon Carbide (SiC) commutation switches (switching matrix details available under NDA).
Thermodynamics & Kinetic Recovery Principle
The Alternator Control Module (ACM) and Permanent Magnet Generator (PMG) recover a portion of the vehicle's own kinetic energy during deceleration, downhill grades, and coasting/glide phases (mechanical recovery imposes drivetrain load and does not create net energy). Claimed architecture goals focus on charge acceptance decoupling, reduced thermal stress in the propulsion pack, and decelerative recoup. Net range benefit depends on drive cycle and is being quantified on the test bench.
Conducting Institutional Technical or Financial Diligence?
Request access to test bench documentation, patent specification summaries, and financial models under NDA.